한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Austrian Pumori Expedition 1998

Pumori · 1998 · 가을 (3) · Austria

원정 개요

BC beside lake above Gorak Shep
ABC at bottom of SE Face
C1 80-90m below East Col.

Did not pitch a C1 because normal site at 6000-6100m because small space and very dangerous from overhanging seracs. 15 Nov only leader and 2 Nepalese went to summit. 3 members Skalnik, Hoermandinger and Patlik had left ABC on 14th with summit party but turned back because not fully acclimatized and had been frightened by retreating British Pumori team's horror stories of avalanching and did not reach camp at 6500m. 15th left camp at 6500m (which they called C2) at 7:15 am and reached top at 12:20 pm and down to BC at 6:15 pm. Technically difficult on East Ridge where were crevasses and just off track in deep powder snow, wind that sometimes blew climbers off track a little.

Had stayed a little late after waiting to see whether wind would become too strong but it did not and the three men went for the top. Members left BC 16 Nov in start of bad snowing weather, returned to BC 22nd to clean mountain of tents and all ropes and left 27 Nov.

  • 내부 원정 ID3227
  • 원본 EXPIDPUMO98307
  • 대장Herbert Mayerhofer
  • 루트 (Route)SE Face/Ridge-E Ridge
  • 최고 도달고도7138m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 14명

이름국적역할정상 등정산소사망
Herbert MayerhoferAustriaLeader성공--
Thomas BardorfAustriaClimber---
Andreas BergmannAustriaClimber---
Walter HauerAustriaExp Doctor---
Peter HoermandingerAustriaClimber---
Johann KreycaAustriaClimber---
Gottfried MarischkaAustriaClimber---
Roman PatlikAustriaClimber---
Martin SchlampAustriaClimber---
Richard SchwarzAustriaClimber---
Roland SchwarzAustriaClimber---
Walter SkalnikAustriaClimber---
Phuchhanga (Puchhang) BhoteNepalH-A Worker성공--
Lhakpa Dorje SherpaNepalH-A Worker성공--

출처·참고문헌

연결된 원본 Reference가 없습니다.