한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Pumori Expedition 1998

Pumori · 1998 · 가을 (3) · Italy

원정 개요

BC at Lobuche (Pyramid Research Lab)
ABC for southeast side pair
High point on SE Face/Ridge route.

Comi and Magliano went up normal route on SE Face/Ridge with deposit 5800m and biv at 6250m on 11 Oct and at midnight of 11/12 Oct started for top but turned back at 7000m because impossible for 2 people to reach higher in very deep snow.

On 12th at 7:00 am other 2 members met them at biv in descent from summit via SW Ridge (Japanese route). Bufacchi and Passino had gone up on 10th Oct from 5500m and spent 2 nights on climb, one at 6000m at Col of ridge and other night at 6500m on SW Ridge to top on 12th about 6:30 am. All back in pyramid on 13 Oct evening. SE site too dangerous with serac threatening to break off and climbers exposed for 3 hours to this danger.

Passino wanted to do SW Ridge because it safer while Magliano not capable of such a technical route.

  • 내부 원정 ID3136
  • 원본 EXPIDPUMO98303
  • 대장Michele Comi
  • 루트 (Route)SE Face/Ridge by 2 members (to 7000m)
  • 최고 도달고도7138m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 4명

이름국적역할정상 등정산소사망
Michele ComiItalyLeader---
Jacopo BufacchiItalyClimber성공--
Alberto MaglianoItalyClimber---
Giorgio PassinoItalyClimber성공--

출처·참고문헌

· 1998 · 잡지 (3) · HIGH
http://www.sevensummits.it/Attivita/spedizioni.asp · 1998 · 웹사이트 (5) ·