한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Langshisa Ri Polish Himalaya Expedition

Langshisa Ri · 1987 · 가을 (3) · Poland

원정 개요

BC just above Langshisa Jhang (same as Japanese)
C1 near col at start of ridge
C2 at ridge running SE from summit 6145m and very near this summit
High point on SW Summit.

No time to go on to highest summit because had had to spend lot of time in KTM with govt routine and time running out. 2 members had chest problems and snowblindness and dropped out of climb. Jez had left on 20th Oct due to other commitments, so little personnel left. Had to fix rope on ridge above C1 and C2: 700m because very sharp narrow snow-ice and rock ridge between 11-22 Oct. 1.20m new snow in storm of 18-20 Oct followed by lot of avalanching but ridge route most affected except C1 covered by snow though tents not damaged. Beyond SW Summit it is posssible to reach highest summit but one 200m section vertical; there were serious seracs about midway between the summits. Perhaps only 2 more days climbing to highest summit and back to C2 in an alpine-style climb. All team members left BC 27th Oct except Jez, who had to leave early.

  • 내부 원정 ID297
  • 원본 EXPIDLSIS87301
  • 대장Miroslaw Gardzielewski
  • 루트 (Route)SE Ridge of SW Summit
  • 최고 도달고도6145m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유시간 부족 (9)

참가자 7명

이름국적역할정상 등정산소사망
Miroslaw GardzielewskiPolandLeader---
Jolanta PatynowskaPolandDeputy Leader---
Janusz BartosPolandClimber---
Anna Bruzdowicz-DudekPolandClimber---
Andrzej JezPolandClimber---
Danuia KasiuraPolandExp Doctor---
Felicja PaszekPolandClimber---

출처·참고문헌

Cheney, Michael J. & Hawley, Elizabeth · 1987 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12198821302/Asia-Nepal-Langshisha-Ri-Southwest-Summit · 1987 · 웹사이트 (5) ·