한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Basque Expedition Everest 98

Everest · 1998 · 봄 (1) · Spain

원정 개요

ABC on Rongbuk Glacier 30 minutes below start of face
C1 at ridge/rib left of Japanese Couloir (1 tent)
High point at top of Japanese Couloir.

1st 1300m of face all ice very steep and no place for camp - 1300m fixed rope ABC to C1; almost every afternoon snowfall and took long time to fix rope. 14 May reached highest point at 7500m and on 15th accumulated snow started avalanching. After 15 May waited 3-4 days to decide about going on and 18 May 2 members went to 7500m to see situation and found much dangerous snow (possible slab avalanche) so face climb finished.

  • 내부 원정 ID2594
  • 원본 EXPIDEVER98105
  • 대장Joseba Elorrieta
  • 루트 (Route)N Face (Japanese Couloir area)
  • 최고 도달고도7500m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 7명

이름국적역할정상 등정산소사망
Joseba Mirene Elorrieta MendiolaSpainLeader---
Jose Ramon Arberas BarruetaSpainBC Manager---
Shanti Dominguez AlegreSpainClimber---
Borja Garcia AlegreSpainClimber---
Inaki Garcia ErenoSpainClimber---
Yolanda Martin SondesaSpainClimber---
Inaki Unanue MateoSpainClimber---

출처·참고문헌

· 1998 · 잡지 (3) · HIGH