Ama Dablam Expedition & Kangtega Expedition
Ama Dablam · 1997 · 겨울 (4) · France
원정 개요
BC at normal site.
30 Nov made C1 at 5700m and slept there with clients. 3 Dec again up and made C1 at 5400m at larger space for camp (all members again to C1). 4 Dec all up for acclimatization to 6000m and then decided climb too difficult for clients to go higher in alpine-style so down to BC on 4th Dec.
3 guides on 6 Dec 3:00 pm up to C1 at 5400m at 6:00 pm; 2:00 am on 7th all 3 to top at 11:00 am and down to BC 5:00 pm same day. It's a technical climb especially at yellow tower without fixed ropes. Clients tired and this was a good experience for them (have climbed together in Alps). Left BC 9 Dec but arrived Lukla on 14th only because yaks could not reach BC through snow and spent 2 days at Thyangboche during snowfall.
Decided not to go to Kangtega becauses too much snow - plan to go next year, perhaps in spring.
- 내부 원정 ID2487
- 원본 EXPIDAMAD97403
- 대장Christophe Profit
- 루트 (Route)SW Ridge
- 최고 도달고도6814m
- 정상 등정 성공예
- 산소 사용미사용·확인 필요
- 종료 사유정상 등정 성공 (1)
참가자 5명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Christophe Profit | France | Leader | 성공 | - | - |
| Olivier Besson | France | Climber | 성공 | - | - |
| Jean Blanchard | France | Climber | 성공 | - | - |
| Philippe Lasnier | France | Climber | - | - | - |
| Lisa Sanchez | USA | Climber | - | - | - |