한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Korean Winter Himalaya Kangtega Expedition

Kangtega · 1985 · 겨울 (4) · S Korea

원정 개요

BC at southwest end of Kyashar Glacier
C3 on South Ridge.

C2 and C3 vertical (80-90 degrees and overhung) rock and ice so very difficult and 1000m fixed rope needed and snow avalanching destroyed same of it. C1 to C2 and C4 to top fairly easy. Tents broken at C1 by avalanches from Thamserku and at BC by strong wind. No fixed rope left for use above C3 despite danger in not having it.

Delay making C3 due to extreme delay of baggage from Korea by ship and overland to Kathmandu. Leader and Roh arrived BC 20 Dec with this baggage; other members had taken purchases from KTM to make lower camps and await their arrival via Puma helicopter.

Had planned second summit attack, but bad weather (strong wind and snowfall) meant it was called off and expedition ended.

  • 내부 원정 ID235
  • 원본 EXPIDKTEG85401
  • 대장Lee Dae-Seok
  • 루트 (Route)SW Face-S Ridge
  • 최고 도달고도6783m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 11명

이름국적역할정상 등정산소사망
Dae-Seok LeeS KoreaLeader성공--
Kyung-Soo JeonS KoreaDeputy Leader---
Yong-Su YunS KoreaActing Leader---
Chang-Bok HanS KoreaClimber---
Ho-Sang LeeS KoreaClimber---
Jin-Gea MinS KoreaClimber---
Chang-Woo ParkS KoreaClimber---
Jong-Baek RohS KoreaClimber---
Jae-Ho ShinS KoreaClimber---
Byung-Jin SonS KoreaClimber---
Ang Dorje SherpaNepalH-A Worker성공--

출처·참고문헌

Nyka, Jozef · 1985 · 학술지·저널 (2) · AAJ
· 1985 · 잡지 (3) · MM
http://publications.americanalpineclub.org/articles/12198622301/Asia-Nepal-Kangtega-in-Winter · 1985 · 웹사이트 (5) ·