한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

1997 Dong Guk University Dhaulagiri I Expedition

Dhaulagiri I · 1997 · 봄 (1) · S Korea

원정 개요

BC at normal site
C1 at NE Col
C2 on NE Ridge
C3 on top of ridge
High point at C2.

On main trail to BC up Myagdi Khola, snow avalanches in section between Boghara and Lipsiba required 2 days to make new trail. Were first team on mountain and made most of route; fixed 1100m on C2 and C3. Jeong and Kim Dae-Won stayed in C2 because not acclimatizing to altitude. Dhaulagiri I very long ridge and avalanche danger; left C3 at 2:30 am on 27 April and on top 2:40 pm by Park; Kazi on top at 2:00 pm and last man Kim Hun-Sang at 3:00 pm; were 100m or so apart so as not to set off avalanches on top of each other; returned C3 7:00-7:30 pm so night fell. 28th all in BC. Windy (down from top at about 7600m very strong and took shelter under rock half hour).

Kaji said has completed 32 years, his village in Loding, Takakharni VDC, Solu near Junbesi.

  • 내부 원정 ID2213
  • 원본 EXPIDDHA197103
  • 대장Park Young-Seok
  • 루트 (Route)NE Ridge
  • 최고 도달고도8167m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 6명

이름국적역할정상 등정산소사망
Young-Seok ParkS KoreaLeader성공--
Wang-Yong HanS KoreaClimber성공--
Kwang-Kyo JeongS KoreaClimber---
Dae-Won KimS KoreaClimber---
Hun-Sang KimS KoreaClimber성공--
Kaji (Pasang Kaji, Pasang Kami) SherpaNepalH-A Worker성공--

출처·참고문헌

· 1997 · 잡지 (3) · HIGH