한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Austrian Dhaulagiri Expedition

Dhaulagiri I · 1996 · 가을 (3) · Austria

원정 개요

BC at normal site
C1 at NE Col
C2 on NE Ridge
C3 on NE Ridge
C4 on NE Ridge.

Never had such heavy snowfall; one captured at C1 for 5 days in which 4m of snowfall; very dangerous to come down of their these 6 days. Already had great problem to cross Dhampus Pass to reach BC because of deep snow. 15th made depot 6400m and down to BC. After C3 established on 20th, most days windy and not fully acclimatized so to C1. 22nd unable to leave C1 because of capture by snow. Finally on 28th reached BC after having run short of food; arrived at C1 after winds had luckily blown 4m snow away. Ammerer, Eduard Koblmueller, Michael Koblmueller, Schmollngruber & Schuetter in this push. 1st Nov to C2; 3rd to C3 ([Ammerer] down to C2 because cold and windy); 4th made C4 and 5th on top.

  • 내부 원정 ID1925
  • 원본 EXPIDDHA196306
  • 대장Eduard Koblmueller
  • 루트 (Route)NE Ridge
  • 최고 도달고도8167m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 8명

이름국적역할정상 등정산소사망
Eduard (Edi) KoblmuellerAustriaLeader성공--
Michael KoblmuellerAustriaDeputy Leader성공--
Gustav AmmererAustriaClimber---
Erwin FunklAustriaClimber---
Otto PopatnikAustriaClimber---
Engelbert RuetzAustriaClimber---
Ferdinand SchmollngruberAustriaClimber성공--
Herbert SchuetterAustriaClimber성공--

출처·참고문헌

· 1996 · 잡지 (3) · HIGH