한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Eiselin Sports Dhaulagiri Expedition 1980

Dhaulagiri I · 1980 · 봄 (1) · Switzerland

원정 개요

Ballmann + Burkhardt - 27 May 80

6 came to KTM todayl others in Marpha and on to KTM 3 or 4 June.
2 with frostbitten toes but no major loss.
No accidents and one pneumonia in early days reached summit.
New snow on 15th and 16th delayed more summit attempts and no oxygen in high camp.

Ang Rita after 1st ascent descended to ABC at 5700m before going up again; spent more than week over 7000m. Never used oxygen as other 2 Sherpas but all members summiters did.

Ballmann met Polish, etc. They all 4 climbed face to 7500m to Swiss C3, then down for rest and back up NE Ridge all the way from 4500m-4700m until 16 May. Then up with Ballmann's party and on top with Ballmann party from C3, which was highest cap at 7500m.


Shailendra Raj Sharma - 26 May 80

Summit by 17 men:
13 May- 1) Hans Van Kaenel, leader, 40, Bern
2) Fritz Luchsinger, 59 years
3) Ang Rita Sherpa, 36, Namche, at top 10:30 am

14 May- 4) Hans Zimmermann, 43, electrician, Biel, Switzerland
5) Hans Joerg Mueller, 1949, mountain guide, Reichabach, Switz.
6) Josep Buholzer, 1947, joiner, Horw, Switzerland
7) Raymond Monneret, 1942, Moutier, Switzerland

17 May- 8) Hana Burgstaller, 44, master baker, Putzleinsdorf, Austria
9) Hans Eitel
10) Fredy Graf, Switzerland
11) Marcel Ruedi, Switzerland

18 May- 12) Mike Ballmann, Switzerland
13) Rudolf Bleiker, Switzerland
14) Mingma Gyalzen Sherpa
15) Lhakpa Gyalzen Sherpa (without oxygen)

19 May- 16) Simon Burkhandt, Switzerland
17) Jean Mueller, Switzerland
18) Ang Rita Sherpa (again)

Expedition finished.


Von Kaenel & Burger - 17 March 80

Route = NE Ridge (Swiss route)
Leave KTM 19 or 20 March; last member arrives KTM tomorrow and all baggage here.
Road to Pokhara; leave by 22 March arrive 13-14 days to BC with about 200
porters via Myagdi Khola.
BC at Italian site at 4600m and one week there.
Prepare ABC at 5600m after one month start for Col.
3 camps above ABC summit in 1st 10 days of May.
9 Sherpas above BC including sirdar Mingma Mote.
Oxygen for climbing above last camp at 7800m (same may not use it).
Give chance to advanced climbers (good ones but no stars) to climb 8000m.
20th anniversary of 1st ascent when all food brought from Switzerland; now as
much food as possible from Nepal.

  • 내부 원정 ID1865
  • 원본 EXPIDDHA180101
  • 대장Hans Von Kaenel
  • 루트 (Route)NE Ridge
  • 최고 도달고도8167m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 21명

이름국적역할정상 등정산소사망
Johann (Hans) Von KaenelSwitzerlandLeader성공사용-
Kornelia AugstburgerSwitzerlandClimber---
Samuel (Mike) BallmannSwitzerlandClimber성공사용-
Rolf BleikerSwitzerlandClimber성공사용-
Josef BuholzerSwitzerlandClimber성공사용-
Hans BurgstallerAustriaClimber성공사용-
Simon BurkhardtSwitzerlandClimber성공사용-
Hans Volker EitelW GermanyClimber성공사용-
Duane EwersUSAClimber---
Fredy GrafSwitzerlandClimber성공사용-
Fritz LuchsingerSwitzerlandClimber성공사용-
Cestmir LukesSwitzerlandClimber---
Raymond MonneratSwitzerlandClimber성공사용-
Hans Joerg MuellerSwitzerlandClimber성공사용-
Jean MuellerSwitzerlandClimber성공사용-
Marcel RuediSwitzerlandClimber성공사용-
Hans ZimmermannSwitzerlandClimber성공사용-
Ang Rita SherpaNepalH-A Worker성공--
Lhakpa Gyalzen/Gyalu SherpaNepalH-A Worker성공--
Mingma Gyalzen SherpaNepalH-A Worker성공--
Mingma Mote SherpaNepalSirdar---

출처·참고문헌

Von Kaenel, Hans · 1980 · 학술지·저널 (2) · AAJ
· 1980 · 잡지 (3) · MM
http://publications.americanalpineclub.org/articles/12198126602/Asia-Nepal-Dhaulagiri · 1980 · 웹사이트 (5) ·