Everest Expedition
Everest · 1996 · 여름 (2) · Switzerland
원정 개요
BC at normal route's base
ABC on normal route's base from east side of North Col.
First climbed up Japanese Couloir in first attempt on mountain; reached 7300m and then down because wind slab avalanche danger and winds very strong.
2nd attempt via N Ridge to 7700m on 20th Sept and left where winds got very strong and again all snow blown away planned to descend by ski (Arpin) & snowboard (Troillet) so had to have snow on mountain.
3rd attempt left BC on 24th and non-stop to 7700m, spent few hours there and reached 8300m having left tent at 8000m and then with increasing winds turned back and climb finished.
- 내부 원정 ID1831
- 원본 EXPIDEVER96201
- 대장Jean Troillet
- 루트 (Route)N Face (Japanese Couloir) (to 7300m)
- 최고 도달고도8300m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유악천후 (4)
참가자 8명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Jean Fernand Troillet | Switzerland | Leader | - | - | - |
| Pascal Arpin | France | Climber | - | - | - |
| John Travers Falkiner | Australia | Climber | - | - | - |
| Thomas Grissom | USA | Climber | - | - | - |
| Dominique Perret | Switzerland | Climber | - | - | - |
| Mark Shapiro | Canada | Climber | - | - | - |
| Apa (Appa) Sherpa | Nepal | H-A Worker | - | - | - |
| Krishna Bahadur (Jeta) Tamang | Nepal | H-A Worker | - | - | - |
출처·참고문헌
Hawley, Elizabeth · 1996 · 학술지·저널 (2) · AAJ
· 1996 · 잡지 (3) · HIGH
http://publications.americanalpineclub.org/articles/12199730100/Asia-Nepal-Mount-Everest-Post-Monsoon · 1996 · 웹사이트 (5) ·