Ama Dablam 1996 Basque Expedition
Ama Dablam · 1996 · 봄 (1) · Spain
원정 개요
BC at normal site
C1 lower than normal
C2 near tower (normal site)
High point at C2.
C1 low because only 2 people to carry and very far to normal site. Where C2 was would need fixed rope and had none in C2, would have to go down to it, go up again, but much snow and very tired. Did not see any fixed rope in place above them. No time to go down and back up. Every day at noon low clouds and slight snowfall. In climbing had to be very careful because of snow and ice. No one else on mountain at same time. Gave up on April 28.
- 내부 원정 ID1730
- 원본 EXPIDAMAD96102
- 대장Josu Bereziartua
- 루트 (Route)SW Ridge
- 최고 도달고도0m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유보급·장비 (8)
참가자 2명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Jesus Maria (Josu) Bereziartua Etxaniz | Spain | Leader | - | - | - |
| Amaia Aranzabal Ezpeleta | Spain | Climber | - | - | - |
출처·참고문헌
· 1996 · 잡지 (3) · HIGH