한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Langtang Lirung 1994

Langtang Lirung · 1994 · 가을 (3) · Spain

원정 개요

BC at bottom of glacier just northeast of Seng Demsa village
C2 on West Face of South Ridge.

A) Details of approach march from KTM to Base Camp:
21 Sep KTM to Dhunche.
22 Sep Dhunche to Ghoretabela
24 Sep Langtang to Langtang BC

B) Date, Altitude and place of the establishment of BC: 25 Sep at 4450m

C) Climbing route attempted beyond BC:
Base Camp : 4450m 25 Sep
Camp I : 5200m 29 Sep
Camp II : 5800m 03 Oct
Bivouac I : 6500m 04 Oct
Camp III : 6800m 05 Oct
Summit : 7233m 07 Oct

D) Climbing details beyond the BC, the name of the members, date and
altitude of pitching of higher camps:
26 Sep rest at Base Camp
27 Sep established C1 5200m and returned to BC
28 Sep BC to C1 and returned to BC
29 Sep BC to C1 5200m and camp
30 Sep C1 to C2 and returned to C1
01 Oct C1 to C2 and returned to C1
02 Oct C1 to C2 and camped at C2
03 Oct C2 5800 m to Bivouac I 6500m
04 Oct Bivouac I 6500m to C3 6800m
05 Oct C3 6800m rest
06 Oct C3 to 6900m and returned to C3
07 Oct C3 to Summit at 14:20 hours NST

E) Details of summit attempt (the name of the members who started for
summit which camp, altitude, date and time, oxygen used or not,
the route to the summit, the time reached at the summit, the time
stayed at the summit, activities of summiters at the summit,
activities of summitters at the summit, if they found something at
the summit or if they left something at the summit, took
photograph or not hoisted the flags or not, feeling of the
summiters at the summit, weather condition, etc):
Summit from C3 at 6800m by South Ridge at 2:20 pm NST on 7th
Oct 1994, and 10 minutes stayed at summit activities of summitters
at the summit.
If they found something at the summit or if they left something at
the summit: nothing found and nothing left took photograph or not:
took photographs hoisted the flags or not: Hoisted flag of
Catalunya feeling and decided to do expedition to Annapurna I
weather condition: very cold, windy and good visibility

F) If expedition team abandons its climbing, the highest point of
altitude reached and the date, name of the members who reached that
height. The details of the reason for abandoning the attempt:
Abandoned by Mr Joan Portes Costa
Highest point reached at 5200m
Abandoned date 03 Oct
Caused of abandoned Health (Lungs) problem

H) Date of leaving base camp and details of return march from base
camp to Kathmandu:
09 Oct C1 to BC to Langtang
10 Oct Langtang rest
11 Oct Langtang to Syabrubesi
12 Oct Syabrubesi to Thade
13 Oct Thade to Kathmandu

I) Details of cleaning the litters and garbage on apprach route, in
the base camp in the higher camps and in climbing route (quantity
of garbage burnt, places and quantity of garbage buried place &
date):
74 kgs garbage bring back to Base camp including about 14 kgs
garbage left from previous expedition about 20 kgs burried and rest
burnt 7 pieces snowbar and 5 pieces rock piton bring to Kathmandu
which was left by previous expedition.
J) Fire woods were used or not during the expedition, if please
mention the quantity and place: During expedition fire woods are
not used
K) Other details if any:

This should be attached along with the report to be submitted after the
complation of the expedition as pers schedule 5 of the mountaineering regulation.

Financial Details
1. Total expenditure of the expedition US$13,850 including airfare
2. Amount for the equipments to provided to the liaison officer,
Nepalese members and Nepalese workers
For liaison Officer US$ 1000
Guide US$ 700
Cook US$ 500
3. Total expenditure within the Kingdom of Nepal US$ 8780
4. Custom and import duties
5. Royalty: US$ 2000
6. Insurance premium paid in Nepal for Nepalese: US$ 300
7. Agency Service charge: $4280 for full arrangement trip
8. Allowance to Liaison officer, sirdar, altitude guides and basecamp
worker
Liaison Officer $ 89.79
Sirdar $ 89.79
Cook $ 79
Sherpa $ 74
9. Wages to Local Porter $667
10. Fooding expenses in approach and return march $
11. Lodging expenses in approach and return march $
12. Lodging and fooding in Kathmandu in friends house
13. Local purchases (please specify the items broadly)

  • 내부 원정 ID1361
  • 원본 EXPIDLANG94301
  • 대장Carles Gonzalez De Agustin
  • 루트 (Route)SW Face
  • 최고 도달고도7227m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 4명

이름국적역할정상 등정산소사망
Carles Gonzalez de AgustinSpainLeader성공--
Manuel (Manolo) Miranda RodriguezSpainClimber성공--
Joan Portes CostaSpainClimber---
Eduardo Sanchez SanchezSpainClimber성공--

출처·참고문헌

Hawley, Elizabeth · 1994 · 학술지·저널 (2) · AAJ
· 1994 · 잡지 (3) · HIGH
· 1994 · 잡지 (3) · HIGH
Himalayismo EspanolNicolas, Pedro · 1994 · 단행본 (1) ·
http://publications.americanalpineclub.org/articles/12199524702/Asia-Nepal-Langtang-Lirung · 1994 · 웹사이트 (5) ·