한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Austrian Tilicho Peak Expedition

Tilicho · 1994 · 가을 (3) · Austria

원정 개요

BC near northeast end of Tilicho Lake
Depot at NE Spur (not slept in)
C1 at top of NE Spur (normal C2 site).

5 members slept night of 9th in C1 but next morning 2 go down with altitude problems while 3 to summit and leader arrives at C1. One member attempted again on 12th to make summit bid but again altitude sickness and down from C1. Very good snow conditions. No avalanche problem.

Before went to Tilicho, trekked around west side of Dhaulagiri & down to Kali Gandaki at Marpha so had 6 nights of acclimatization.

1. Italian Dhaulagiri BC 3700m
2. Stop BC 3900m
3. Normal Dhaulagiri BC 4800m
4-6. Near Dhampus Pass; then 3 nights 2 days rest at Marpha.

Left Marpha 4th Oct and slept at 4150m before Mesokantu Pass.

  • 내부 원정 ID1350
  • 원본 EXPIDTILI94303
  • 대장Hubert Fritzenwallner
  • 루트 (Route)NE Spur-N Ridge
  • 최고 도달고도7134m
  • 정상 등정 성공예
  • 산소 사용미사용·확인 필요
  • 종료 사유정상 등정 성공 (1)

참가자 9명

이름국적역할정상 등정산소사망
Hubert FritzenwallnerAustriaLeader성공--
Barbara BrunnerAustriaClimber성공--
Hermann FaulandAustriaClimber---
Maria FritzenwallnerAustriaBC Manager---
Johann GratzAustriaClimber---
Johann (Hans) GschwandtlAustriaClimber---
Anton HofmannAustriaClimber---
Siegfried SchererAustriaClimber성공--
Franz SchratlAustriaClimber성공--

출처·참고문헌

Hawley, Elizabeth · 1994 · 학술지·저널 (2) · AAJ
· 1994 · 잡지 (3) · HIGH
http://publications.americanalpineclub.org/articles/12199525502/Asia-Nepal-Tilitso-Post-Monsoon-Ascents-and-Attempt · 1994 · 웹사이트 (5) ·