한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Belgian Military Expedition Expedition Dhaulagiri 1994

Dhaulagiri I · 1994 · 가을 (3) · Belgium

원정 개요

BC at normal site
Depot camp 0n a plateau
C1 above col on right side of col
C2 on NE Ridge
High point at NE Ridge.

Took long time to reach C2 because of winds. Had acclimatization up to 6000m in 8 days in Chamonix lodge and in 5 days Brussels pressure chamber for pilots but above 6000m did feel altitude. From Brussels chamber to BC was 9 days. 17th 3 Ukrainians dissappeared in slab avalanche & French Sherpas investigated snow conditions & reported terrible snow condition. Now 25th at 6000m after sun behind ridge at 3 pm.

Ukrainians took clothing & gear of other teams.

Mousny did no climbing on Dhaulagiri because not acclimatized since had not been Brussels chamber.

  • 내부 원정 ID1340
  • 원본 EXPIDDHA194308
  • 대장Bernard Mousny
  • 루트 (Route)NE Ridge
  • 최고 도달고도6700m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유산악 상태 (5)

참가자 6명

이름국적역할정상 등정산소사망
Bernard MousnyBelgiumLeader---
Pascal DebrouwerBelgiumClimber---
Geert GeunesBelgiumClimber---
Linda Le BonBelgiumClimber---
Francis MagerBelgiumClimber---
Carlo VansteeneBelgiumClimber---

출처·참고문헌

Hawley, Elizabeth · 1994 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12199525703/Asia-Nepal-Dhaulagiri-Ascents-Attempts-and-Tragedies-in-the-Post-Monsoon · 1994 · 웹사이트 (5) ·