Showa Printing Ama Dablam Expedition 1993-94 Winter
Ama Dablam · 1993 · 겨울 (4) · Japan
원정 개요
BC at normal site
C2 a biv tent only
High point at SW Ridge.
Tried summit bid from C2 8th Jan by Kimoto. Left C2 at 3 am and reached 6300m at 7 am, then turned back because very strong wind, down to BC at 2 pm. Route between C1 to C2 very difficult technical rock climbing on sharp ridge and other 3 members very tired from route-making, did not go above C1. Between 1 and 6 Jan had some snowfall: 20 cm at BC, but main problem was wind. No time to make another summit bid; no plan for this. Kimoto spent nights of 6th and 7th Jan at C2 (not really a proper camp but biv tent only) because strong winds on 7th. Weather changed 26th Dec with jet stream wind stronger.
- 내부 원정 ID1307
- 원본 EXPIDAMAD93404
- 대장Hiroshi Nakamura
- 루트 (Route)SW Ridge
- 최고 도달고도6300m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유악천후 (4)
참가자 4명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Hiroshi Nakamura | Japan | Leader | - | - | - |
| Satoshi Kimoto | Japan | Climber | - | - | - |
| Ryo Saitoh | Japan | Climber | - | - | - |
| Nobuo Tsutsumi | Japan | Climber | - | - | - |
출처·참고문헌
Hawley, Elizabeth · 1993 · 학술지·저널 (2) · AAJ
· 1993 · 잡지 (3) · HIGH
· 1993 · 잡지 (3) · IWA
· 1993 · 잡지 (3) · IWA
http://publications.americanalpineclub.org/articles/12199421602/Asia-Nepal-Ama-Dablam-Winter-Ascents-and-Attempt · 1993 · 웹사이트 (5) ·