Swiss Eiselin Himalayan Expedition
Everest · 1993 · 봄 (1) · Switzerland
원정 개요
BC at road (end of East Rongbuk Glacier)
ABC at East Rongbuk Glacier
C1 at North Col
C2 at North Spur on North Ridge.
Planned to have summit bid on 25th May but on 24th wind too strong to move up to make C3 and with rigid time table, it was necessary to go down.
Bass - 6 May 93
Bass left BC 1 May.
Expedition camps:
BC 21 April at 5200m
C1 pitched at 5800m
ABC pitched at 6400m
C3 being reached at North Col
Bass used oxygen his last day at mountain as he had severe case of HAPE.
Yaks to arrive ABC 26 May to remove loads for withdrawal from mountain.
- 내부 원정 ID1222
- 원본 EXPIDEVER93118
- 대장Gaudenz Bass, Christoph Jezler
- 루트 (Route)N Col-NE Ridge
- 최고 도달고도7700m
- 정상 등정 성공아니오
- 산소 사용사용
- 종료 사유악천후 (4)
참가자 8명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Gaudenz Bass | Switzerland | Leader/Exp Doctor | - | 사용 | - |
| Christoph Peter Jezler | Switzerland | Leader | - | - | - |
| Fredl (Alfred) Beetschen | Switzerland | Climber | - | - | - |
| Hans Berger | Switzerland | Climber | - | - | - |
| Lothar Mann | Germany | Climber | - | - | - |
| Fritz Maurer | Switzerland | Climber | - | - | - |
| Mario Rizzi | Switzerland | Climber | - | - | - |
| Markus Peter Staehelin | Switzerland | Climber | - | - | - |
출처·참고문헌
Hawley, Elizabeth · 1993 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12199427203/Asia-Tibet-Everest-Other-Pre-monsoon-North-Col-Ascents-and-Attempt · 1993 · 웹사이트 (5) ·