한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Adventure Peaks Everest Expedition 2024

Everest · 2024 · 봄 (1) · UK

원정 개요

Heli to Pangboche, Lobuche East

BC 25/04 5350m
C1 30/04 5900m
C2 01/05 6440m
C3 19/05 7100m
C4 20/05 7900m
Smt 22/05 by Harling, Goodwin, Funnell at 6:30 am, Mills at 8 am,
Phurba Wangchhu (16 summits) at 6:30 am, Furinjee Sherpa at 8 am.

On the first rotation, the team touched C3 on 03/05 and spent the night at C2. On the summit rotation, they spent an extra night at C4 due to dehydration. The Lhotse Face was very hot during their ascent as there was no wind.

They left at 9:20 pm on 21/05. Straightforward climb. Balcony at 12:40 am. It was not too busy on the route. Weather was still and clear. They spent about 30 minutes on the summit and descended to C4 where they arrived at 11:.30 am and at 5 pm (Mills, Furinjee).

On 23/05 they slept at C2 and on 24/05. Left BC on by heli on 27/05.

Sherpas above BC: 3 (one was sick)

Oxygen:
Taken and used from bottom of the Lhotse face to top back to bottom
of Lhotse face by members
Taken and used from C3 to top to C3 by Sherpas.

  • 내부 원정 ID11362
  • 원본 EXPIDEVER24133
  • 대장Christian Harling
  • 루트 (Route)S Col-SE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 6명

이름국적역할정상 등정산소사망
Christian Hamish HarlingUKLeader성공사용-
Jayson Launce FunnellS AfricaClimber성공사용-
Jake Martyn GoodwinUKClimber성공사용-
Jonathan David MillsUKClimber성공사용-
Phu Rinji SherpaNepalH-A Worker성공사용-
Phurba Wangchhu SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.