Carlos Soria Dhaulagiri Expedition 2019
Dhaulagiri I · 2019 · 가을 (3) · Spain
원정 개요
BC 18/09 4650m
C1 27/09 5600m
C2 02/10 6550m
C3 10/10 7250m
HPt 10/10 7250m by all members at C3.
Climb abandoned on 11/10 due to snow, wind conditions.
Spent night at C3. Wanted to summit that night, but was too windy. Went down to C1 on 11/10. On 12/10 to BC. Uxue all the way down to BC on 11/10. Team left BC on 13/10.
Lakpa [Temba] and another Sherpa summitted a week before the team reached HPt as they fixed the ropes to the summit.
Oxygen: taken, not used by members.
Hired:
“Mikkel” Sherpa
Lakpa Sherpa (S)
Phurtenji Sherpa
Mingma Sherpa
Ang Dawa Sherpa
- 내부 원정 ID10403
- 원본 EXPIDDHA119302
- 대장Carlos Soria
- 루트 (Route)NE Ridge
- 최고 도달고도7250m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유악천후 (4)
참가자 4명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Carlos Soria Fontan | Spain | Leader | - | - | - |
| Luis Carcavilla Urqui | Spain | Climber | - | - | - |
| Luis Miguel Lopez Soriano | Spain | Climber | - | - | - |
| Maria Uxue Murolas Aguerri | Spain | Climber | - | - | - |
출처·참고문헌
연결된 원본 Reference가 없습니다.