한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

International Mountain Guides (IMG) Cho Oyu Expedition 2019

Cho Oyu · 2019 · 가을 (3) · Nepal

원정 개요

ABC 10/09 5700m
C1 16/09 6400m
C2 24/09 7120m
Smt 25/09 by Silloway at 9:15 am (NST)
by Gabby Kanizay at 9:30 am
by Inagaki and Jane Kanizay at 9:55 am
by Van Kesteren at 11:15 am.

Summit team left from C2 at 1:16 am on the 25th Sept. Conditions: wasn’t too cold, slightly snowing, not great visibility. After the Yellow Band it was a little clear. Loose snow in places.

Time spent on summit:
Inagaki 20 minutes
Van Kesteren 5 mins
Silloway 45 mins (broke trail with her Sherpa guide Chhewang Lendu)

Back to C2 and spent the night there and down to ABC on the 26 Sept.

Oxygen: From C2 taken and used.

Sherpas:
Mingma Sherpa, Khumjung-9 (with Inagaki)
Pasang Kami Sherpa (PK), Khumjung-9 (with Van Kesteren)
Chhewang Lendu Sherpa, Khumjung-9 (with Silloway)
Phu Nuru Sherpa, Khumjung-9 (w Gabby Kanizay)
Pasang Sherpa, Makalu (with Jane Kanizay)

  • 내부 원정 ID10392
  • 원본 EXPIDCHOY19302
  • 대장Phu Nuru Sherpa
  • 루트 (Route)NW side
  • 최고 도달고도8188m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 10명

이름국적역할정상 등정산소사망
Phu Nuru (Phunuru) SherpaNepalLeader성공사용-
Yukinori InagakiJapanClimber성공사용-
Gabrielle Jane KanizayAustraliaClimber성공사용-
Jane Frances KanizayAustraliaClimber성공사용-
Kimberly Ann SillowayUSAClimber성공사용-
Jolanda Van KesterenNetherlandsClimber성공사용-
Chhewang Lendu (Tsewang Lendu) SherpaNepalH-A Worker성공사용-
Mingma SherpaNepalH-A Worker성공사용-
Pasang SherpaNepalH-A Worker성공사용-
Pasang Kami (PK) SherpaNepalH-A Worker성공사용-

출처·참고문헌

https://www.mountainguides.com/cho-oyu19.shtml · 2019 · 웹사이트 (5) ·
https://thehimalayantimes.com/nepal/australias-gabby-becomes-youngest-girl-to-climb-cho-oyu-as-sherpa-scales-mountain-for-19th-time/ · 2019 · 웹사이트 (5) ·