Asian Trekking Ama Dablam Expedition 2019
Ama Dablam · 2019 · 가을 (3) · USA
원정 개요
BC 07/10 4570m
C1 09/10 5770m
C2 reached but did not sleep there.
Did not summit. 6250m was high point on 16/10. Turned around because there was a lot of snow, didn’t feel safe because he was a small group, Sherpa was climbing slower than he wanted.
Description of climb:
Moved 300m in two and half hours on summit push (too slow).
First five days had terrible weather, cloud and snowfall, cleared up after
that, moderate winds
Couple pitons popped from fixed rope, but no injuries or other accidents
Went down to BC after summit attempt, arrived around 4 pm.
First person to show up on mountain.
Left BC on 17/10.
Sherpas: One [Nawang Tenzing]
Fixed rope: Put in six pins and two pickets, but did not put up any ropes.
Oxygen:
Sherpa took one for emergency, did not use. Member did not take or use.
- 내부 원정 ID10341
- 원본 EXPIDAMAD19324
- 대장Joshua Ross
- 루트 (Route)SW Ridge
- 최고 도달고도6250m
- 정상 등정 성공아니오
- 산소 사용미사용·확인 필요
- 종료 사유산악 상태 (5)
참가자 2명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Joshua Daniel Ross | USA | Leader | - | - | - |
| Nawang Tenzing (Nawangle) Sherpa | Nepal | H-A Worker | - | - | - |