German Ama Dablam Expedition 2019
Ama Dablam · 2019 · 가을 (3) · Germany
원정 개요
From Pemba's Facebook page:
Late post though me and my client Jens Nonnewitz from Germany summited Mt Amadablam, 6812m on 11.11.019 around 8 am. Wind was high like 30 to 35 kmph that day with temperature -30 in the morning, we managed it and we were the first one to reach summit and three more followed us to the summit that day.
Pic 1-Me and my client on the summit
Pic 2-sunset from Camp 1, 5800m with prayerflags
Pic 3-Enroute from camp 2.7 and above. Climbers lowering down from camp 3
Pic 4-Red Beaked Chough flying high into thin air; shot from camp 2 high above clouds
From Jens Nonnewitz (email) - 23 July 2020
Arrival BC - 04.11.2019
C1 - 06.11.2019 acclimatization
- 09.11.2019
C2 - 10.11.2019
Smt - 11.11.2019 at 8 am with Pemba
Left C2 at 3 am
No ropes fixed
20 mins on summit and descened to C2; following day to BC
Left BC - 14.11.2019
- 내부 원정 ID10325
- 원본 EXPIDAMAD19308
- 대장Jens Nonnewitz
- 루트 (Route)SW Ridge
- 최고 도달고도6814m
- 정상 등정 성공예
- 산소 사용미사용·확인 필요
- 종료 사유정상 등정 성공 (1)
참가자 2명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Jens Nonnewitz | Germany | Leader | 성공 | - | - |
| Pemba Sherpa | Nepal | H-A Worker | 성공 | - | - |