한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

American Ama Dablam Expedition

Ama Dablam · 1984 · 봄 (1) · USA

원정 개요

BC at Mingbo yak pasture (for water).

On 10th April heavy snowfall (10 inches) which tripled time from ABC to C1; most technical climbing is between C1 and C2; fairly difficult rock and with new snow had to fix 400 ft more rope than would otherwise and which meant later ran short of rope.

Reached C2 site on 18th April at top of yellow tower but never occupied C2 (at c20,000 ft). Snowed 2-3 inches fresh snow daily after 10th. All together in C1 decided supplies insufficient to succeed in the 10 days required at their rate of progress so far and more urgently had not that much time because had to be back in US at their jobs. Took 2-3 days to get all gear back down to BC.

French had gone to S Ridge also although their permit was for S Face - very gentlemanly immediately left because hadn't the equipment and technical competence.

  • 내부 원정 ID1032
  • 원본 EXPIDAMAD84102
  • 대장James Eisenhard
  • 루트 (Route)SW Ridge
  • 최고 도달고도6100m
  • 정상 등정 성공아니오
  • 산소 사용미사용·확인 필요
  • 종료 사유보급·장비 (8)

참가자 7명

이름국적역할정상 등정산소사망
James M. (Jim) EisenhardUSALeader---
Robert T. (Ted) BrittsanUSADeputy Leader---
Benjamin De HaanUSAClimber---
Dorothy LandeenUSABC Manager---
Carl RootUSAClimber---
Barbara RumerUSAClimber---
Michael TrotterUSAExp Doctor---

출처·참고문헌

Eisenhard, James · 1984 · 학술지·저널 (2) · AAJ
http://publications.americanalpineclub.org/articles/12198527003/Asia-Nepal-Ama-Dablam-Attempt · 1984 · 웹사이트 (5) ·