한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Imagine Nepal Lhotse Expedition 2019

Lhotse · 2019 · 봄 (1) · Nepal

원정 개요

Christina Flampouri (with the team) set off at 2 am from BC on 10 May, reached C2 on 11 May in 6 hours. She arrived C3 on 12 May in 6 hours and stayed at C3 for 2 more nights due to the windy weather. Then she arrived C4 in 6 hours and stayed there for 2 hours. She started summit push at 11 pm on 13 May and summited at 9:45 am on 14 May. 5 climbers summited at the same time with the Sherpa rope-fixing team. On the team, Sirbaz Khan had a little bit frostbite because they were with the rope-fixing team for 8-10 hours and it was too cold. On the team 5 climbers and 7 Sherpas all summited. Flampouri summited Everest on 20 May as well.

Sykaris is listed with his own Makalu-Lhotse expedition (LHOT-191-02).

  • 내부 원정 ID10276
  • 원본 EXPIDLHOT19101
  • 대장Mingma Gyalje Sherpa
  • 루트 (Route)W Face
  • 최고 도달고도8516m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 14명

이름국적역할정상 등정산소사망
Mingma Gyalje SherpaNepalLeader---
Pranay Kashinath BandbucheIndiaClimber---
Christina FlampouriGreeceClimber성공사용-
Li GaoChinaClimber성공사용-
Sirbaz KhanPakistanClimber성공--
Xiao-Lin LiChinaClimber성공사용-
Hui-Wen ZengChinaClimber---
Dawa Gyalje (Dawa Gyalzen) SherpaNepalH-A Worker성공사용-
Dawa Tenzin (Dawa Tenji) SherpaNepalH-A Worker성공사용-
Dendi SherpaNepalH-A Worker성공사용-
Kili Pemba (Kilu Pemba) SherpaNepalH-A Worker성공사용-
Pemba Chhoti SherpaNepalH-A Worker성공사용-
Phurba Chhoter (Ang Jangbu) SherpaNepalH-A Worker성공사용-
Tamting SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.