한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Alpomania Everest North 2019

Everest · 2019 · 봄 (1) · Ukraine

원정 개요

BC 18/04 5700m
ABC 24/04 6400m
C1 02/05 7000m
C2 21/05 7700m
C3 22/05 8300m
Smt 23/05 by all members and Dawa Tenzing, Mingma Nuru Sherpa, Nima [Nuru] and
Tshering [Wangchu] Sherpa at 5:58 am.

Summit team left C3 at 9:20 pm on 22/05. There were about 100 people on the route. They only had to wait for 20 minutes before the first small wall (about 7m). That was the only time they really had to wait. Straightforward climb. They spent about 40 minutes on the summit and apart from Klenova and Dawa Tenzing all members descended to ABC, where they arrived at 10 pm. Klenova stayed at the North Col and all other Sherpas apart from Dawa Tenzing stayed at 7700m. On 24/05 Klenova descended to ABC and the whole team left for BC the same day and left BC on 25/05.

Oxygen:
Taken and used from North col to top to 6600m my members apart from Sypavin,
Sypavin from 7600m to top to 6600m
From 7700m to top to 7700m by Sherpas.

  • 내부 원정 ID10245
  • 원본 EXPIDEVER19177
  • 대장Valentyn Sypavin
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 8명

이름국적역할정상 등정산소사망
Valentyn SypavinUkraineLeader성공사용-
Ekaterina KlenovaRussiaClimber성공사용-
Vitali KozubskyiUkraineClimber성공사용-
Pavlo SydorenkoUkraineClimber성공사용-
Dawa Tenzing SherpaNepalH-A Worker성공사용-
Mingma Nuru SherpaNepalH-A Worker성공사용-
Ngima Nuru SherpaNepalH-A Worker성공사용-
Tshering Wangchu (Tshering Ongchuk) SherpaNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.