한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

Furtenbach Adventures Classic Everest North Expedition 2019

Everest · 2019 · 봄 (1) · Germany

원정 개요

BC 16/04 5700m
ABC 25/04 6400m
C1 01/05 7000m
C2 22/05 7700m
C3 23/05 8300m
Smt 24/05 by Berner and Sherpa at 5:20 am; Desota and Sherpa at 5:30 am;
Haas, Jelinek, Baldy, Eckhoff, Kjoelvik, Stitzinger and SIX Sherpa
at 5:35 am.

Summit team left C3 at 9:45 pm. It was not so busy on that day. About 60 people on the route. Clear and calm in the morning later in the afternoon about 30km/h wind. They spent about half an hour on the summit and descended to ABC, where they arrived between 4 pm and 7 pm. On 25/05 to CBC. Berner descended all the way to CBC, where he arrived at 8.30 pm. Team left BC on 26/05.

Mueller reached ABC on 25/04. He did not feel up to the climb and left ABC on 03/05.

Oxygen:
Used from crampon point (6650m) to top to North Col by members
From C2 to top to C1 by Stitzinger; from C1 to top to C1 by Sherpas.

  • 내부 원정 ID10235
  • 원본 EXPIDEVER19167
  • 대장Luis Stitzinger
  • 루트 (Route)N Col-NE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 18명

이름국적역할정상 등정산소사망
Luis Andreas StitzingerGermanyLeader성공사용-
Jason M. BaldyUSAClimber성공사용-
Ingo BernerGermanyClimber성공사용-
Robin Noel DesotaUSAClimber성공사용-
Joachim EckhoffAustriaClimber성공사용-
Guenter Karl HaasGermanyClimber성공사용-
Tomas JelinekGermanyClimber성공사용-
Ole Jakob KjoelvikNorwayClimber성공사용-
Rainer MuellerGermanyClimber---
Ang Kaji SherpaNepalH-A Worker성공사용-
Dorchi SherpaNepalH-A Worker성공사용-
Fudorchi SherpaNepalH-A Worker성공사용-
Kusang SherpaNepalH-A Worker성공사용-
Lakpa SherpaNepalH-A Worker성공사용-
Nima Dorje SherpaNepalH-A Worker성공사용-
Pemba Rinzi/Rinji SherpaNepalH-A Worker성공사용-
Ram Nurbu SherpaNepalH-A Worker성공사용-
Mingmar TamangNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.