한국산악아카이브 | KOREA MOUNTAIN ARCHIVE

본문 바로가기

히말라얀 데이터베이스

⌂ 처음 화면
← 산의 원정 기록

First Chinese Women's Everest Expedition 2019

Everest · 2019 · 봄 (1) · China

원정 개요

Three Chinese women went through the 2014 avalanche, 2015 earthquake, 2016 Ma Li-Yamu summited Everest, 2017 Tsang Yin-Hung summited Everest, 2018 Sun Ning-Ning summited Manaslu; they have the idea of "First Chinese Women's Everest team" in 2019; one more male photographer will be in the team until BC.

BC 24/04
C1 /
C2 01/05
C3 19/05
C4 20/05
Smt 22/05 by Tsang Yin-Hung (Ada), Sun Ning-Ning, Ma Li-Yamu (Maizi).

Team started from C4 at 6 pm (Tsang) and 9 pm (Ma and Sun). Tsang summited at 3 am, Sun summited at 9:07 am and Ma summited at 9:46 am. They stayed on the summit for about 10-15 minutes. Weather was not windy and clear, sunny high up the mountain.

They got back to BC at 1:30-2:25 pm on 24 May and flew BC to Ktm by heli on 25 May.

Oxygen: Taken and used C2-Summit-C2 (Members); C3-Summit-C3 (Sherpas).

Other peaks: Nangkartshang Gompa (S) 5083m


Note from Chinese team:

Ma said the dead Indian female climber Kalpana Dash schedule was always one day behind Ma's team. Kalpana Dash walked very slow on the way. She summited and became so sick and couldn't move anymore at Hillary Step (8760m). Pemba Dorji Sherpa (Phurba's big brother) was her guide.

Zhou Tianmin (from Dolma Outdoor) and Ms. Kalpana Dash are not clients of Dreamers Destination Treks originally and we are not responsible for their climbing management part and appointing Sherpas. They shared permit with us and we provided base camp service only.

Note: Media reports state that Dashi died near the Balcony (8400m).

Report from Zhou Tian-Min:

BC 16/04
C1 01/05
C2 02/05
C3 20/05
C4 21/05
Smt 22/05 by all members, all Sherpas

Started at C4 at 8 pm. Summit at 8:15 am by Tianmin and his Sherpas Kaji and Pasang. Weather was good; after summit weather deteriorated and some clouds. Got back to C4 at 5 pm.

Tsang Yin-Hung summit at 3 am with Phurba Tenzing.
Sun Ning-Ning and Mingma Nuru Sherpa summit at 9:07 am.
Ma Li-Yamu and Phurba Thile Sherpa summit at 9:46 am

Zhou left BC on 25/05 heli to KTM.

Other peaks: Lobuche Peak by Zhou Tianmin

Oxygen:
Taken and used by members from C3 to summit and down to C3
By Sherpa from C4 to summit and down to C4

Hired:
Kaji Sherpa
Pasang Sherpa
Phurba Thile Sherpa
Phurba Tenzing Sherpa
Mingma Nuru Sherpa

  • 내부 원정 ID10194
  • 원본 EXPIDEVER19126
  • 대장Ma Li-Yamu
  • 루트 (Route)S Col-SE Ridge
  • 최고 도달고도8849m
  • 정상 등정 성공예
  • 산소 사용사용
  • 종료 사유정상 등정 성공 (1)

참가자 14명

이름국적역할정상 등정산소사망
Li-Yamu MaChinaLeader성공사용-
Kalpana DashIndiaClimber성공사용사망
Ning-Ning SunChinaClimber성공사용-
Kanchhi Maya TamangNepalClimber성공사용-
Yin-Hung (Ada) TsangChinaClimber성공사용-
Tian-Min ZhouChinaClimber성공사용-
Kazi (Kaji) SherpaNepalH-A Worker성공사용-
Mingma Nuru (Ang Nuru) SherpaNepalH-A Worker성공사용-
Pasang Tendi SherpaNepalH-A Worker성공사용-
Pemba Chhiri SherpaNepalH-A Worker성공사용-
Pemba Dorje SherpaNepalSirdar성공사용-
Phurba Tenzing SherpaNepalH-A Worker성공사용-
Phurba Thile SherpaNepalH-A Worker성공사용-
Gyalbo TamangNepalH-A Worker성공사용-

출처·참고문헌

연결된 원본 Reference가 없습니다.