Kobler & Partner Ama Dablam Expedition 2019
Ama Dablam · 2019 · 봄 (1) · Switzerland
원정 개요
BC 4700m 21/04
C1 5650m 24/04
C2 5950m 28/04 by Rempfler, Doerig, Sonam Sherpa
Sonam reached around 6700m beforehand as he was fixing the ropes.
On first rotation, the team wanted to continue to C2; however, they had had a bad night and descended to BC. Second rotation they reached C2, but decided to abandon expedition due to exhaustion and technical difficulties.
Climb abandoned due to: difficulties to acclimatize, technical difficulties (Sherpas mentioned the blue ice near the summit and did not want to fix there).
Team left BC on 29/04.
Fixed rope:
Up to 200m below the summit by Sonam Lama and Sherpas from other expedition
Oxygen:
Taken during the night by Rempfler at C2 due to breathing difficulties and
Cheynes-Stoke breathing.
- 내부 원정 ID10147
- 원본 EXPIDAMAD19103
- 대장Daniel Doerig
- 루트 (Route)SW Ridge
- 최고 도달고도5950m
- 정상 등정 성공아니오
- 산소 사용사용
- 종료 사유산악 상태 (5)
참가자 3명
| 이름 | 국적 | 역할 | 정상 등정 | 산소 | 사망 |
|---|---|---|---|---|---|
| Daniel Doerig | Switzerland | Leader | - | - | - |
| Armin Rempfler | Switzerland | Climber | - | 사용 | - |
| Sonam Sherpa | Nepal | H-A Worker | - | - | - |